A cable-stayed footbridge, erected in 2008 on across the M621 to link the two parts of Hunslet that had been separated by the construction of the motorway. The deck is 103m long, supported from a single 39m tall A-frame tower by 14 steel cables. A total of 259 tonnes of steel was used and a 200t capacity mobile crane was used in the construction (source: http://www.steelconstruction.info/Hunslett_Moor_Footbridge ).
Uploaded to Geograph by Stephen Craven on 30 April 2016
Photo © Stephen Craven, 30 April 2016. Licensed for reuse under this Creative Commons licence